Mon–Fri 7:00 AM – 6:00 PM CST| 713.470.3501
Accure Estimates Logo Accure Estimates
Call 713.470.3501 Request an Estimate

Mechanical Estimating

HVAC equipment, ductwork, piping, insulation and controls quantified and priced — so nothing gets missed between the mechanical schedule and your final number.

1,900+
Mechanical Bids Estimated
48 HRS
Avg. Turnaround
98.7%
Takeoff Accuracy
27
States Served
Mechanical Estimating

What's Included

  • Rooftop units, air handlers, VAV boxes & mechanical equipment schedules
  • Ductwork takeoff by gauge, type & fitting, including insulation
  • Hydronic & refrigerant piping, valves, pumps & hangers
  • Controls & BAS integration scope coordination
  • Sheet metal and duct fabrication labor estimating

What You'll Receive

Every estimate includes these five deliverables, organized and ready for bid day.

Proposal Package

Complete proposal including Scope of Work, Exclusions, and Terms & Conditions.

📄 Includes SOW & T&C

Bill of Material

Detailed material quantities and specifications for procurement.

📦 Quantities & Specs

Cost Summary

Clear breakdown of all costs including labor, materials, and equipment.

💰 Labor & Materials

Markup Plans

Digitally marked-up plan sets showing all takeoff quantities.

📐 Digital Takeoff

Revisions & Addendums

Tracking and incorporation of all design changes and addendums.

🔄 Change Tracking

How We Estimate Mechanical Estimating

STEP 01

Send Plans & Bid Date

Upload drawings and specs through our form, email, or WhatsApp along with your bid due date.

STEP 02

Scope Confirmation

An estimator reviews the set and confirms trade scope, exclusions, and turnaround before starting.

STEP 03

Takeoff & Pricing

Quantities are taken off division by division and priced against current material and labor costs.

STEP 04

Delivery & Review

You receive an itemized estimate ready for bid day, with a call available to walk through it.

Common Questions

Can you estimate design-build mechanical scope from partial drawings?

Yes — we regularly work from 50–75% design documents and flag assumptions clearly so you can adjust pricing as drawings develop.

Do you include start-up and TAB costs?

Testing, adjusting and balancing can be scoped in on request; by default we price installed equipment, ductwork and piping.

How do you handle sheet metal fabrication vs. purchased duct?

Tell us your shop's fabrication capability and we'll price labor accordingly, or default to purchased duct standards.

Contractors We've Helped Bid & Win

MR
Marcus Reyes
3 weeks ago

“We send Accure our electrical bid packages and get a full material takeoff and pricing back inside 48 hours. It's let us bid on twice as many jobs without hiring another estimator.”

DC
Diane Cho
a month ago

“Their mechanical estimating team catches things our old process missed — duct fittings, insulation, hangers, all itemized clearly. Our win rate on negotiated work is up noticeably.”

TB
Tyler Brooks
2 months ago

“Accurate, fast, and they actually pick up the phone. We use them as our outsourced estimating department across three states now.”

Get A Mechanical Estimating Quote

Upload your plans and bid date — we'll confirm scope and turnaround same day.

Request an Estimate